Show Navigation

531 Sixth Ave - GOR-1206386-cE21

531 Sixth Avenue shell frame before prefab window frames are installed, like a Chinese puzzle, sliding into groves being installed.

Prefab building process is when the individual modules of a building are built in a controlled factory setting using an assembly line process, beginning with building the frame and ending with the interior and exterior finishes. Completed modules are delivered to the site and pieced together to form a finished building.

Add to Cart Add to Lightbox Download
Filename
531 Sixth Avenue Prefab Building Sky and Clouds - GOR-1206386-cE21.jpg
Copyright
© Joel Gordon 2021- All rights reserved
Image Size
3200x4800 / 13.4MB
https://www.photoshelter.com/support/license
https://www.joelgordon.com/contact
531 Sixth Avenue hi-raise mixed use building window shell frames being installed .cantilevers day exterior looking up
Contained in galleries
Working 04) Work in Process 531 & 546 Sixth Ave - Tech Hub - 799 Broadway
531 Sixth Avenue shell frame before prefab window frames are installed, like a Chinese puzzle, sliding into groves being installed.<br />
<br />
Prefab building process is when the individual modules of a building are built in a controlled factory setting using an assembly line process, beginning with building the frame and ending with the interior and exterior finishes. Completed modules are delivered to the site and pieced together to form a finished building.
Info
  • Facebook
  • Twitter
x

Joel Gordon Photograhy

  • Archive
    • All Galleries
    • Cart
    • Lightbox
    • Client Area
  • Search
  • About
  • Contact